Our Project Roles 🔌
Supply
Design
Install & Test
Perform Factory Acceptance Test
Perform Maintenance

Recent Projects
Role Icons refer to the roles carried out for the corresponding project.
Roles vary depending on the type of project.
The Siemens 36 KV switch gear being unpacked, assembled, installed, tested and commissioned by Leecorp.
Client
Wysinco
Year
2023
Location
Spanish Town, Jamaica
The Siemens Nxair and GM switchgear which was initially supplied by Leecorp during 2021 - 2022 was later inspected in March, 2023.
Client
Grand Bahama Power Co
Year
2023
Location
Freeport, Bahamas
Inspecting the Leecorp supplied Siemens 33 KV, NXAIR switchgear with Barbados Light and Power Engineers in Barbados.
Client
Barbados Light and Power
Year
2023
Location
Barbados
Leecorp conducting electrical construction of the 10 MW co-generation plant at Caribbean Broilers in Hill Run St Catherine, Jamaica for JPSCO.
Client
JPSCO
Year
2021
Location
St Catherine, Jamaica
Leecorp conducting a factory acceptance test of Siemens HMI equipment, in San Jose Costa Rica. This was to be installed at Wisynco in Jamaica for the cogeneration project.
Leecorp also leading the development and delivery of the Siemens S7 PLC HMI (human machine interface) to West Indies Synthetics Ltd. This was for the cogeneration project, which involved the implementation of the power distribution control system for the the 1 MW plant( phase 1) integrated .
Client
Wisynco
Year
2019
Location
San Jose, Costa Rica
Francois Lee of Leecorp and a Siemens engineer commissioning the Siemens Nxair switchgear at the JPSCO Bogue power plant in Montego Bay.
Client
Jamaica Public Service Co Ltd
Year
2017
Location
Montego Bay, Jamaica
Leecorp crew cutting trench and re-installing fast track heavy power cables at the IGL cogeneration and oxygen plant in Kingston.
Client
Industrial Gases Ltd
Year
2019
Location
Kingston, Jamaica
Leecorp’s Francois Lee, the technical director, visiting the Siemens Queretario Factory in Mexico to inspect a 33 KV Siemens switchgear for the Wisynco Phase 1, 4MW cogeneration project.
Client
Wisynco, Jamaica
Year
2019
Location
Queretario, Mexico
Leecorp crew installing the solar car park at Norman Manley International Airport in Kingston.
Client
Norman Manley International Airport
Year
2018
Location
Kingston, Jamaica
Francois Lee of Leecorp and a Siemens engineer inspecting the Siemens 36 KV switchgear at Barbados Light and Power, a 10 MW solar farm with a battery energy storage system.
Client
Barbados Light and Power
Year
2017
Location
St. Lucy, Barbados
Recent site visit by Leecorp and Siemens (October 2023)to The Grand Anse and Queens Park substations in Grenada which was built by Siemens and assisted by Leecorp in 2010. This was the first high voltage sub station built in Greneda.
Its worked trouble free for 10 years.
Client
Greneda Electricity Company
Year
built 2010, site visit October 2023
Location
Greneda